South Carolina is building 1.2 GW of new data centers. Here is how much sheet metal workers work that makes — and why there are not enough sheet metal workers for it.

7 sites |about $46,080/yr |Low shortage
Worth training up?
NO — plenty already

Sheet metal workers for South Carolina's data centers: about 290 to spare.

Needed at peak
75
Free to take it on
365
Short or extra
290 spare
New permanent jobs
Enough workers?

Will South Carolina have enough workers?

At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.

just enough SHORT TO SPARE Ironworkers short 168 Sheet metal workers 290 spare Network/low-voltage technicians 499 spare Pipefitters 1,109 spare Plumbers 1,258 spare Electricians 1,286 spare Carpenters 1,357 spare HVAC/R technicians 1,443 spare Welders 1,713 spare
The short version

What this means for sheet metal workers in South Carolina

South Carolina is building 1.2 GW of new AI data centers across 7 sites. On a data center, sheet metal workers build and hang the ductwork that moves cool air through the rooms.

Sheet metal workers — probably not, just for this. The data centers need about 75 sheet metal workers, and South Carolina already has about 365 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

South Carolina has 7 data-center sites in the works, with 1.2 GW still to build. That keeps sheet metal workers busy for years: as one job winds down, the next one is starting, so the work does not dry up after a single build.

South Carolina sheet metal workers earn about $46,080 a year on average. Data-center work pays more than that, and when a trade is short, overtime can push experienced sheet metal workers well over $100,000 a year, with health care and a pension through the union.

It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

The building work runs a few years, not forever — but South Carolina has enough lined up to keep you busy, and the skills carry over to every other big job in the state. To start, look at the South Carolina sheet metal workers apprenticeship programs. That is the way in. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Get sheet metal workers job updates for South Carolina