Mississippi is building 2.6 GW of new data centers across 10 sites. Here is the work that means for the trades — and why there are not enough workers for it.

10 sites |2.6 GW still to build |4,900 workers at peak
Running now
300 MW
Still to build
2.6 GW
Total workers on site at peak
4,900
Jobs after they open
599
Mississippi data centers: running now vs. still to build
Running now: 300 MW Still to build: 2.6 GW Total: 2.9 GW
The bottom line

Worth training up for in Mississippi?

YES means the data centers will need more of that trade than Mississippi can spare — so they pay well, pay to train, and run overtime. NO means there are already plenty.

YES
Ironworkers
Big shortage — short about 561 workers
YES
Data center technicians
Lots of steady jobs — 419 steady jobs once they open
YES
Carpenters
Big shortage — short about 284 workers
YES
Electricians
Tight — needs almost all the area can spare
YES
Network/low-voltage technicians
Tight — needs almost all the area can spare
YES
Pipefitters
Tight — needs almost all the area can spare
CLOSE
Sheet metal workers
Could go either way — about 132 to spare
CLOSE
HVAC/R technicians
Could go either way — about 434 to spare
CLOSE
Plumbers
Could go either way — about 532 to spare
NO
Welders
Plenty already — about 1,259 to spare

"Short" means the data centers need more of that trade at the busiest point than the area has free to take on new work. Most workers stay on their regular jobs; only about 1 in 4 are free for big new projects like these.

Enough workers?

Will Mississippi have enough workers?

At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.

just enough SHORT TO SPARE Ironworkers short 561 Carpenters short 284 Electricians 34 spare Network/low-voltage technicians 119 spare Sheet metal workers 132 spare Pipefitters 226 spare HVAC/R technicians 434 spare Plumbers 532 spare Welders 1,259 spare
The short version

What this means if you work a trade in Mississippi

Mississippi is building 2.9 GW of new AI data centers across 10 sites. 300 MW is already running, and 2.6 GW is still being built. The biggest builders here are Amazon (AWS), xAI, Compass, AVAIO Digital Partners.

At the busiest point, about 4,900 skilled workers will be on these sites at once, across all the trades. But the work is not split evenly — some trades will be short, and some will not. That is what decides whether it is worth training up.

Should you train up for this? It depends on the trade. In Mississippi, the data centers look most short on ironworkers, carpenters, electricians, network/low-voltage technicians, and pipefitters. Those are the best bets right now. Here is the read, trade by trade.

Ironworkers — worth training up: YES, big shortage. At the busiest point the data centers need about 689 ironworkers, but only about 128 of Mississippi's ironworkers are free to take it on — the rest are busy with their regular jobs, which do not stop. That leaves Mississippi short about 561. When builders cannot find enough ironworkers, the ones already working put in overtime (bigger paychecks), and builders pay to train new people and bring in workers from other states.

Carpenters — worth training up: YES, big shortage. At the busiest point the data centers need about 842 carpenters, but only about 558 of Mississippi's carpenters are free to take it on — the rest are busy with their regular jobs, which do not stop. That leaves Mississippi short about 284. When builders cannot find enough carpenters, the ones already working put in overtime (bigger paychecks), and builders pay to train new people and bring in workers from other states.

Electricians — worth training up: YES, tight. The data centers need about 1,378 electricians at the busiest point — close to all of the ~1,412 electricians Mississippi has free for this kind of work. Expect overtime, steady work, and builders willing to train.

Network/low-voltage technicians — worth training up: YES, tight. The data centers need about 306 network/low-voltage technicians at the busiest point — close to all of the ~425 network/low-voltage technicians Mississippi has free for this kind of work. Expect overtime, steady work, and builders willing to train.

Pipefitters — worth training up: YES, tight. The data centers need about 536 pipefitters at the busiest point — close to all of the ~762 pipefitters Mississippi has free for this kind of work. Expect overtime, steady work, and builders willing to train.

Sheet metal workers — could go either way. The data centers need about 153 sheet metal workers, and Mississippi has about 285 free for this kind of work. Enough to mostly cover it, but it will be busy, with some overtime.

HVAC/R technicians — could go either way. The data centers need about 306 hvac/r technicians, and Mississippi has about 740 free for this kind of work. Enough to mostly cover it, but it will be busy, with some overtime.

Data center technicians — worth training up: YES. Once these data centers open they will need about 419 data center technicians to run them, day and night. These are permanent jobs, and there are not enough local data center technicians to fill them — so they hire and train. Steady, long-term work.

These are some of the best-paying jobs you can get without a four-year degree. When a trade is short, builders run overtime and pay to train, and experienced workers can clear $100,000 a year, with health care and a pension through the union.

The building jobs run for a few years; the jobs that run the data centers last longer. Either way, a shortage is good news if you are in that trade. To start in Mississippi, look at the apprenticeship programs for the trade you want. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Every trade

Every trade, by the numbers

Is there a shortage of each trade for the data centers in Mississippi?
Trade Needed at peak Free to take it on Short or extra New data-center jobs Train up?
Electricians 1,378 1,412 34 spare 108 YES
Carpenters 842 558 short 284 YES
Ironworkers 689 128 short 561 YES
Pipefitters 536 762 226 spare YES
Welders 383 1,642 1,259 spare NO
HVAC/R technicians 306 740 434 spare 48 CLOSE
Network/low-voltage technicians 306 425 119 spare 24 YES
Data center technicians 165 short 254 419 YES
Plumbers 230 762 532 spare CLOSE
Sheet metal workers 153 285 132 spare CLOSE
Elevator mechanics 77

"Needed at peak" is the most of that trade working across all the building at the busiest time. "Free to take it on" is how many local workers could move to data-center jobs — about 1 in 4 of the trade; the rest keep their regular jobs. "Short or extra" is the gap. "New data-center jobs" are permanent jobs that stay once a data center opens. "Train up?" is YES when the work needs more than the area can spare (so they pay well and pay to train), NO when there are plenty already. Elevator mechanics are left out of the verdict because their work depends on the building's design.

Get the Mississippi data-center jobs report

We will email you new Mississippi sites, tips on getting hired, and pay updates. Free.

NO SPAM|UNSUBSCRIBE ANYTIME|FREE FOREVER