AWS Madison County Mega Site – Canton Campus (Phase 1)

Being built now · 431 MW in Canton, MS. See which trades build a data center this size.

Amazon (AWS) |Opens around 2027
Size
431 MW
Status
Being built now
Total workers on site at peak
828
Built by
Amazon (AWS)
This data center: built vs. still to build
Running now: 0 MW Still to build: 431 MW Total: 431 MW
Who builds it

Workers on site at peak at AWS Madison County Mega Site – Canton Campus (Phase 1)

Electricians233Carpenters142Ironworkers116Pipefitters91Welders65HVAC/R technicians52Network/low-voltage technicians52Plumbers39Sheet metal workers26Elevator mechanics13

How many of each trade will be working on this site at the busiest point.

The short version

What this data center means for the trades

AWS Madison County Mega Site – Canton Campus (Phase 1) is Amazon (AWS)'s data center in Canton, MS. It is being built right now, and it will be about 431 MW when it is done. It is set to open around 2027.

A data center this size takes a small army to build. At the busiest point, about 828 workers will be on site at once. Electricians are needed the most — about 233 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.

Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.

Canton is part of a bigger building boom in Mississippi, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a Mississippi apprenticeship. The trade pages for Mississippi show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Track Amazon (AWS) & Mississippi data-center hiring