Who builds Georgia's
data centers?
Georgia is building 5.8 GW of new data centers across 31 sites. Here is the work that means for the trades — and why there are not enough workers for it.
Worth training up for in Georgia?
YES means the data centers will need more of that trade than Georgia can spare — so they pay well, pay to train, and run overtime. NO means there are already plenty.
"Short" means the data centers need more of that trade at the busiest point than the area has free to take on new work. Most workers stay on their regular jobs; only about 1 in 4 are free for big new projects like these.
Will Georgia have enough workers?
At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.
What this means if you work a trade in Georgia
Georgia is building 7.1 GW of new AI data centers across 31 sites. 1.3 GW is already running, and 5.8 GW is still being built. The biggest builders here are Microsoft, (undisclosed), Amazon (AWS), QTS.
At the busiest point, about 11,146 skilled workers will be on these sites at once, across all the trades. But the work is not split evenly — some trades will be short, and some will not. That is what decides whether it is worth training up.
Should you train up for this? It depends on the trade. In Georgia, the data centers look most short on ironworkers, carpenters, pipefitters, and electricians. Those are the best bets right now. Here is the read, trade by trade.
Ironworkers — worth training up: YES, big shortage. At the busiest point the data centers need about 1,567 ironworkers, but only about 132 of Georgia's ironworkers are free to take it on — the rest are busy with their regular jobs, which do not stop. That leaves Georgia short about 1,435. When builders cannot find enough ironworkers, the ones already working put in overtime (bigger paychecks), and builders pay to train new people and bring in workers from other states.
Carpenters — worth training up: YES, tight. The data centers need about 1,916 carpenters at the busiest point — close to all of the ~2,405 carpenters Georgia has free for this kind of work. Expect overtime, steady work, and builders willing to train.
Pipefitters — worth training up: YES, tight. The data centers need about 1,219 pipefitters at the busiest point — close to all of the ~1,882 pipefitters Georgia has free for this kind of work. Expect overtime, steady work, and builders willing to train.
Electricians — worth training up: YES, tight. The data centers need about 3,135 electricians at the busiest point — close to all of the ~5,185 electricians Georgia has free for this kind of work. Expect overtime, steady work, and builders willing to train.
Network/low-voltage technicians — could go either way. The data centers need about 697 network/low-voltage technicians, and Georgia has about 1,775 free for this kind of work. Enough to mostly cover it, but it will be busy, with some overtime.
Sheet metal workers — could go either way. The data centers need about 348 sheet metal workers, and Georgia has about 962 free for this kind of work. Enough to mostly cover it, but it will be busy, with some overtime.
Plumbers — probably not, just for this. The data centers need about 522 plumbers, and Georgia already has about 1,882 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.
Data center technicians — worth training up: YES. Once these data centers open they will need about 1,037 data center technicians to run them, day and night. These are permanent jobs, and there are not enough local data center technicians to fill them — so they hire and train. Steady, long-term work.
These are some of the best-paying jobs you can get without a four-year degree. When a trade is short, builders run overtime and pay to train, and experienced workers can clear $100,000 a year, with health care and a pension through the union.
The building jobs run for a few years; the jobs that run the data centers last longer. Either way, a shortage is good news if you are in that trade. To start in Georgia, look at the apprenticeship programs for the trade you want. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.
Every trade, by the numbers
| Trade | Needed at peak | Free to take it on | Short or extra | New data-center jobs | Train up? |
|---|---|---|---|---|---|
| Electricians | 3,135 | 5,185 | 2,050 spare | 267 | YES |
| Carpenters | 1,916 | 2,405 | 489 spare | — | YES |
| Ironworkers | 1,567 | 132 | short 1,435 | — | YES |
| Pipefitters | 1,219 | 1,882 | 663 spare | — | YES |
| Welders | 871 | 3,508 | 2,637 spare | — | NO |
| HVAC/R technicians | 697 | 3,052 | 2,355 spare | 119 | NO |
| Network/low-voltage technicians | 697 | 1,775 | 1,078 spare | 59 | CLOSE |
| Data center technicians | — | 695 | short 342 | 1,037 | YES |
| Plumbers | 522 | 1,882 | 1,360 spare | — | NO |
| Sheet metal workers | 348 | 962 | 614 spare | — | CLOSE |
| Elevator mechanics | 174 | 128 | — | — | — |
"Needed at peak" is the most of that trade working across all the building at the busiest time. "Free to take it on" is how many local workers could move to data-center jobs — about 1 in 4 of the trade; the rest keep their regular jobs. "Short or extra" is the gap. "New data-center jobs" are permanent jobs that stay once a data center opens. "Train up?" is YES when the work needs more than the area can spare (so they pay well and pay to train), NO when there are plenty already. Elevator mechanics are left out of the verdict because their work depends on the building's design.
Get the Georgia data-center jobs report
We will email you new Georgia sites, tips on getting hired, and pay updates. Free.
GET THE FREE GEORGIA DATA-CENTER PLAYBOOK BY EMAIL
Which trade to pick in Georgia, which sites are hiring, how to get hired, and what it pays.
FIND YOUR TRADE
Two-minute quiz, then jump to the Georgia trade page where the work is.
Data centers in Georgia (31)
+ 13 more sites in Georgia.