P Prentice
(undisclosed) · GA

Project Sail

Getting permits · 900 MW in Sargent, GA. See which trades build a data center this size.

(undisclosed) |Opens around 2036
Size
900 MW
Status
Getting permits
Total workers on site at peak
1,728
Built by
(undisclosed)
This data center: built vs. still to build
Running now: 0 MW Still to build: 900 MW Total: 900 MW
Who builds it

Workers on site at peak at Project Sail

Electricians486Carpenters297Ironworkers243Pipefitters189Welders135HVAC/R technicians108Network/low-voltage technicians108Plumbers81Sheet metal workers54Elevator mechanics27

How many of each trade will be working on this site at the busiest point.

The short version

What this data center means for the trades

Project Sail is (undisclosed)'s data center in Sargent, GA. It is getting its permits, and it will be about 900 MW when it is done. It is set to open around 2036.

A data center this size takes a small army to build. At the busiest point, about 1,728 workers will be on site at once. Electricians are needed the most — about 486 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.

Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.

Sargent is part of a bigger building boom in Georgia, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a Georgia apprenticeship. The trade pages for Georgia show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Track (undisclosed) & Georgia data-center hiring

We will email you new sites, tips on getting hired, and pay updates. Free.

NO SPAM|UNSUBSCRIBE ANYTIME|FREE FOREVER