Stargate / Oracle / OpenAI / Stack · NM

Stargate Project Jupiter (Doña Ana County, NM)

Being built now · 2.5 GW in Santa Teresa, NM. See which trades build a data center this size.

Stargate / Oracle / OpenAI / Stack |Opens around 2026
Size
2.5 GW
Status
Being built now
Total workers on site at peak
4,704
Built by
Stargate / Oracle / OpenAI / Stack
This data center: built vs. still to build
Running now: 0 MW Still to build: 2.5 GW Total: 2.5 GW
Who builds it

Workers on site at peak at Stargate Project Jupiter (Doña Ana County, NM)

Electricians1,323Carpenters809Ironworkers662Pipefitters515Welders368HVAC/R technicians294Network/low-voltage technicians294Plumbers221Sheet metal workers147Elevator mechanics74

How many of each trade will be working on this site at the busiest point.

The short version

What this data center means for the trades

Stargate Project Jupiter (Doña Ana County, NM) is Stargate / Oracle / OpenAI / Stack's data center in Santa Teresa, NM. It is being built right now, and it will be about 2.5 GW when it is done. It is set to open around 2026.

A data center this size takes a small army to build. At the busiest point, about 4,704 workers will be on site at once. Electricians are needed the most — about 1,323 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.

Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.

Santa Teresa is part of a bigger building boom in New Mexico, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a New Mexico apprenticeship. The trade pages for New Mexico show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.