Joule HP Compute Campus (Delta)

Being built now · 455 MW in Delta, UT. See which trades build a data center this size.

Joule Power (Joule Capital) |Opens around 2026
Size
455 MW
Status
Being built now
Total workers on site at peak
874
Built by
Joule Power (Joule Capital)
This data center: built vs. still to build
Running now: 0 MW Still to build: 455 MW Total: 455 MW
Who builds it

Workers on site at peak at Joule HP Compute Campus (Delta)

Electricians246Carpenters150Ironworkers123Pipefitters96Welders68HVAC/R technicians55Network/low-voltage technicians55Plumbers41Sheet metal workers27Elevator mechanics14

How many of each trade will be working on this site at the busiest point.

The short version

What this data center means for the trades

Joule HP Compute Campus (Delta) is Joule Power (Joule Capital)'s data center in Delta, UT. It is being built right now, and it will be about 455 MW when it is done. It is set to open around 2026.

A data center this size takes a small army to build. At the busiest point, about 874 workers will be on site at once. Electricians are needed the most — about 246 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.

Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.

Delta is part of a bigger building boom in Utah, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a Utah apprenticeship. The trade pages for Utah show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.