P Prentice
Fisk University (operator TBD) · TN

Fisk University AI Data Center (Quantum Leap Campus)

Planned · 30 MW in Nashville, TN. See which trades build a data center this size.

Fisk University (operator TBD)
Size
30 MW
Status
Planned
Total workers on site at peak
58
Built by
Fisk University (operator TBD)
This data center: built vs. still to build
Running now: 0 MW Still to build: 30 MW Total: 30 MW
Who builds it

Workers on site at peak at Fisk University AI Data Center (Quantum Leap Campus)

Electricians16Carpenters10Ironworkers8Pipefitters6Welders5HVAC/R technicians4Network/low-voltage technicians4Plumbers3Sheet metal workers2Elevator mechanics1

How many of each trade will be working on this site at the busiest point.

The short version

What this data center means for the trades

Fisk University AI Data Center (Quantum Leap Campus) is Fisk University (operator TBD)'s data center in Nashville, TN. It is planned, and it will be about 30 MW when it is done.

A data center this size takes a small army to build. At the busiest point, about 58 workers will be on site at once. Electricians are needed the most — about 16 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.

Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.

Nashville is part of a bigger building boom in Tennessee, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a Tennessee apprenticeship. The trade pages for Tennessee show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Track Fisk University (operator TBD) & Tennessee data-center hiring

We will email you new sites, tips on getting hired, and pay updates. Free.

NO SPAM|UNSUBSCRIBE ANYTIME|FREE FOREVER