Mineral, VA

Mineral is building
data centers

Mineral has 420 MW of data centers across 2 sites. That is a lot of work for the trades, and there are not enough workers nearby to do it.

2 sites |420 MW still to build |806 workers at peak
Running now
0 MW
Still to build
420 MW
Total workers on site at peak
806
Building sites
2
Mineral data centers: running now vs. still to build
Running now: 0 MW Still to build: 420 MW Total: 420 MW
The bottom line

Worth training up for in Virginia?

YES means the data centers will need more of that trade than Virginia can spare — so they pay well, pay to train, and run overtime. NO means there are already plenty.

CLOSE
Ironworkers
Could go either way — about 185 to spare
NO
Data center technicians
Enough already — 62 steady jobs once they open
NO
Network/low-voltage technicians
Plenty already — about 738 to spare
NO
Electricians
Plenty already — about 5,848 to spare
NO
Pipefitters
Plenty already — about 3,210 to spare
NO
Sheet metal workers
Plenty already — about 943 to spare
NO
Carpenters
Plenty already — about 4,446 to spare
NO
Welders
Plenty already — about 2,609 to spare
NO
HVAC/R technicians
Plenty already — about 3,360 to spare
NO
Plumbers
Plenty already — about 3,260 to spare

"Short" means the data centers need more of that trade at the busiest point than the area has free to take on new work. Most workers stay on their regular jobs; only about 1 in 4 are free for big new projects like these.

Enough workers?

Will Virginia have enough workers?

At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.

just enough SHORT TO SPARE Ironworkers 185 spare Network/low-voltage technicians 738 spare Sheet metal workers 943 spare Welders 2,609 spare Pipefitters 3,210 spare Plumbers 3,260 spare HVAC/R technicians 3,360 spare Carpenters 4,446 spare Electricians 5,848 spare
The short version

What this means for workers near Mineral

Mineral, VA has about 420 MW of AI data centers across 2 sites, with 420 MW still to build. The builders here include Amazon (AWS).

At the busiest point, about 806 skilled workers will be on these sites at once, across all the trades. Many drive in from nearby towns, but the work starts here — and it is not split evenly, so some trades are short and some are not.

Worth training up for? The work near Mineral is steady, but the area has enough workers for most trades. Here is the read by trade.

Ironworkers — could go either way. The data centers need about 113 ironworkers, and Virginia has about 298 free for this kind of work. Enough to mostly cover it, but it will be busy, with some overtime.

Network/low-voltage technicians — probably not, just for this. The data centers need about 50 network/low-voltage technicians, and Virginia already has about 788 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

Electricians — probably not, just for this. The data centers need about 227 electricians, and Virginia already has about 6,075 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

Pipefitters — probably not, just for this. The data centers need about 88 pipefitters, and Virginia already has about 3,298 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

Sheet metal workers — probably not, just for this. The data centers need about 25 sheet metal workers, and Virginia already has about 968 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

Carpenters — probably not, just for this. The data centers need about 139 carpenters, and Virginia already has about 4,585 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

These are some of the best-paying jobs you can get without a four-year degree. When a trade is short, builders run overtime and pay to train, and experienced workers can clear $100,000 a year, with health care and a pension through the union. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

You sign up and get your license through Virginia. The Virginia trade pages show you how to start. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Every trade

Every trade, by the numbers

Is there a shortage of each trade for the data centers in the Mineral area?
Trade Needed at peak Free to take it on Short or extra New data-center jobs Train up?
Electricians 227 6,075 5,848 spare 16 NO
Carpenters 139 4,585 4,446 spare NO
Ironworkers 113 298 185 spare CLOSE
Pipefitters 88 3,298 3,210 spare NO
Welders 63 2,672 2,609 spare NO
HVAC/R technicians 50 3,410 3,360 spare 7 NO
Network/low-voltage technicians 50 788 738 spare 4 NO
Plumbers 38 3,298 3,260 spare NO
Data center technicians 445 383 spare 62 NO
Sheet metal workers 25 968 943 spare NO
Elevator mechanics 13 148

"Needed at peak" is the most of that trade working across all the building at the busiest time. "Free to take it on" is how many local workers could move to data-center jobs — about 1 in 4 of the trade; the rest keep their regular jobs. "Short or extra" is the gap. "New data-center jobs" are permanent jobs that stay once a data center opens. "Train up?" is YES when the work needs more than the area can spare (so they pay well and pay to train), NO when there are plenty already. Elevator mechanics are left out of the verdict because their work depends on the building's design.