Henderson is building
data centers

Henderson has 125 MW of data centers across 1 sites. That is a lot of work for the trades, and there are not enough workers nearby to do it.

1 sites |0 MW still to build |0 workers at peak
Running now
125 MW
Still to build
0 MW
Total workers on site at peak
0
Building sites
1
Henderson data centers: running now vs. still to build
Running now: 125 MW Still to build: 0 MW Total: 125 MW
The bottom line

Worth training up for in the Henderson area?

YES means the data centers will need more of that trade than the Henderson area can spare — so they pay well, pay to train, and run overtime. NO means there are already plenty.

NO
Data center technicians
Enough already — 18 steady jobs once they open

"Short" means the data centers need more of that trade at the busiest point than the area has free to take on new work. Most workers stay on their regular jobs; only about 1 in 4 are free for big new projects like these.

Enough workers?

Will the Henderson area have enough workers?

At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.

Not enough local data here to compare. See the table below for the worker counts.

The short version

What this means for workers near Henderson

Henderson, NV has about 125 MW of AI data centers across 1 site, with 0 MW still to build. The builders here include Google.

At the busiest point, about 0 skilled workers will be on these sites at once, across all the trades. Many drive in from nearby towns, but the work starts here — and it is not split evenly, so some trades are short and some are not.

Worth training up for? The work near Henderson is steady, but the area has enough workers for most trades. Here is the read by trade.

These are some of the best-paying jobs you can get without a four-year degree. When a trade is short, builders run overtime and pay to train, and experienced workers can clear $100,000 a year, with health care and a pension through the union. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

You sign up and get your license through Nevada. The Nevada trade pages show you how to start. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Every trade

Every trade, by the numbers

Is there a shortage of each trade for the data centers in the Henderson area?
Trade Needed at peak Free to take it on Short or extra New data-center jobs Train up?
Data center technicians 115 97 spare 18 NO
Electricians 1,492 5
HVAC/R technicians 760 2
Network/low-voltage technicians 195 1
Pipefitters 938
Sheet metal workers 212
Ironworkers 185
Plumbers 938
Carpenters 2,438
Elevator mechanics
Welders 238

"Needed at peak" is the most of that trade working across all the building at the busiest time. "Free to take it on" is how many local workers could move to data-center jobs — about 1 in 4 of the trade; the rest keep their regular jobs. "Short or extra" is the gap. "New data-center jobs" are permanent jobs that stay once a data center opens. "Train up?" is YES when the work needs more than the area can spare (so they pay well and pay to train), NO when there are plenty already. Elevator mechanics are left out of the verdict because their work depends on the building's design.

Get Henderson-area data-center job updates

New sites, tips on getting hired, and pay updates near Henderson. Free.

NO SPAM|UNSUBSCRIBE ANYTIME|FREE FOREVER