North Dakota is building 2.5 GW of new data centers. Here is how much ironworkers work that makes — and why there are not enough ironworkers for it.
Ironworkers for North Dakota's data centers: short about 618 workers.
Will North Dakota have enough workers?
At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.
What this means for ironworkers in North Dakota
North Dakota is building 2.5 GW of new AI data centers across 9 sites. On a data center, ironworkers put up the steel frame the building and its heavy gear sit on.
Ironworkers — worth training up: YES, big shortage. At the busiest point the data centers need about 686 ironworkers, but only about 68 of North Dakota's ironworkers are free to take it on — the rest are busy with their regular jobs, which do not stop. That leaves North Dakota short about 618. When builders cannot find enough ironworkers, the ones already working put in overtime (bigger paychecks), and builders pay to train new people and bring in workers from other states.
North Dakota has 9 data-center sites in the works, with 2.5 GW still to build. That keeps ironworkers busy for years: as one job winds down, the next one is starting, so the work does not dry up after a single build.
North Dakota ironworkers earn about $79,480 a year on average. Data-center work pays more than that, and when a trade is short, overtime can push experienced ironworkers well over $100,000 a year, with health care and a pension through the union.
It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.
The building work runs a few years, not forever — but North Dakota has enough lined up to keep you busy, and the skills carry over to every other big job in the state. To start, look at the North Dakota ironworkers apprenticeship programs. That is the way in. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.
Get ironworkers job updates for North Dakota
New North Dakota data-center sites, tips on getting hired, and pay updates for ironworkers.
READ THE NATIONAL IRONWORKERS SWITCH GUIDE -- $9
National ironworkers training, pay, and licensing context. This is not a North Dakota-specific paid guide.
NORTH DAKOTA PROGRAMS
The North Dakota ironworkers apprenticeship programs, schools, and licensing path.
The data centers behind these numbers
- River Run Energy Center – Mercer County Data Center — NextEra Energy Resources, Stanton area (1.5 GW)
- Project Fighting Pike – Williston Campus — Critical Data House, Williston (455 MW)
- Polaris Forge 2 — Applied Digital, Harwood (280 MW)
- Polaris Forge 1 – Building 3 — Applied Digital, Ellendale (150 MW)
- Polaris Forge 1 – Building 1 (ELN02) — Applied Digital, Ellendale (100 MW)
- Core Scientific Grand Forks Data Center (Grand Forks 1) — CoreWeave, Grand Forks (100 MW)