Michigan needs
ironworkers for its data centers
Michigan is building 2.5 GW of new data centers. Here is how much ironworkers work that makes — and why there are not enough ironworkers for it.
Ironworkers for Michigan's data centers: short about 168 workers.
Will Michigan have enough workers?
At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.
What this means for ironworkers in Michigan
Michigan is building 2.5 GW of new AI data centers across 11 sites. On a data center, ironworkers put up the steel frame the building and its heavy gear sit on.
Ironworkers — worth training up: YES, big shortage. At the busiest point the data centers need about 670 ironworkers, but only about 502 of Michigan's ironworkers are free to take it on — the rest are busy with their regular jobs, which do not stop. That leaves Michigan short about 168. When builders cannot find enough ironworkers, the ones already working put in overtime (bigger paychecks), and builders pay to train new people and bring in workers from other states.
Michigan has 11 data-center sites in the works, with 2.5 GW still to build. That keeps ironworkers busy for years: as one job winds down, the next one is starting, so the work does not dry up after a single build.
Michigan ironworkers earn about $63,910 a year on average. Data-center work pays more than that, and when a trade is short, overtime can push experienced ironworkers well over $100,000 a year, with health care and a pension through the union.
It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.
The building work runs a few years, not forever — but Michigan has enough lined up to keep you busy, and the skills carry over to every other big job in the state. To start, look at the Michigan ironworkers apprenticeship programs. That is the way in. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.
Get ironworkers job updates for Michigan
New Michigan data-center sites, tips on getting hired, and pay updates for ironworkers.
READ THE NATIONAL IRONWORKERS SWITCH GUIDE -- $9
National ironworkers training, pay, and licensing context. This is not a Michigan-specific paid guide.
MICHIGAN PROGRAMS
The Michigan ironworkers apprenticeship programs, schools, and licensing path.
The data centers behind these numbers
- Stargate "The Barn" (Saline Township, MI) — Stargate / Oracle / OpenAI / Related, Saline Township (1.4 GW)
- Google Project Cannoli (Van Buren Township) — Google, Van Buren Township (1 GW)
- Switch Grand Rapids Pyramid Campus — Switch, Gaines Township (320 MW)
- Switch Pyramid Campus (Grand Rapids) — Switch, Gaines Township (237 MW)
- Metrobloks Southfield Data Center — Metrobloks, Southfield (100 MW)
- Project Flex - Lyon Township — Google, Lyon Township (size not shared)