Louisiana is building 3 GW of new data centers across 8 sites. Here is the work that means for the trades — and why there are not enough workers for it.

8 sites |3 GW still to build |5,826 workers at peak
Running now
0 MW
Still to build
3 GW
Total workers on site at peak
5,826
Jobs after they open
637
Louisiana data centers: running now vs. still to build
Running now: 0 MW Still to build: 3 GW Total: 3 GW
The bottom line

Worth training up for in Louisiana?

YES means the data centers will need more of that trade than Louisiana can spare — so they pay well, pay to train, and run overtime. NO means there are already plenty.

YES
Ironworkers
Big shortage — short about 429 workers
YES
Data center technicians
Lots of steady jobs — 446 steady jobs once they open
YES
Sheet metal workers
Tight — needs almost all the area can spare
YES
Electricians
Tight — needs almost all the area can spare
CLOSE
Network/low-voltage technicians
Could go either way — about 381 to spare
CLOSE
Carpenters
Could go either way — about 1,203 to spare
NO
HVAC/R technicians
Plenty already — about 896 to spare
NO
Pipefitters
Plenty already — about 1,623 to spare
NO
Welders
Plenty already — about 2,635 to spare
NO
Plumbers
Plenty already — about 1,987 to spare

"Short" means the data centers need more of that trade at the busiest point than the area has free to take on new work. Most workers stay on their regular jobs; only about 1 in 4 are free for big new projects like these.

Enough workers?

Will Louisiana have enough workers?

At the busiest point of the build. Bars to the left mean a shortage (good if you are in that trade). Bars to the right mean workers to spare.

just enough SHORT TO SPARE Ironworkers short 429 Sheet metal workers 38 spare Network/low-voltage technicians 381 spare HVAC/R technicians 896 spare Electricians 1,063 spare Carpenters 1,203 spare Pipefitters 1,623 spare Plumbers 1,987 spare Welders 2,635 spare
The short version

What this means if you work a trade in Louisiana

Louisiana is building 3 GW of new AI data centers across 8 sites. 0 MW is already running, and 3 GW is still being built. The biggest builders here are Amazon (AWS), Hut 8, Meta, Applied Digital.

At the busiest point, about 5,826 skilled workers will be on these sites at once, across all the trades. But the work is not split evenly — some trades will be short, and some will not. That is what decides whether it is worth training up.

Should you train up for this? It depends on the trade. In Louisiana, the data centers look most short on ironworkers, sheet metal workers, and electricians. Those are the best bets right now. Here is the read, trade by trade.

Ironworkers — worth training up: YES, big shortage. At the busiest point the data centers need about 819 ironworkers, but only about 390 of Louisiana's ironworkers are free to take it on — the rest are busy with their regular jobs, which do not stop. That leaves Louisiana short about 429. When builders cannot find enough ironworkers, the ones already working put in overtime (bigger paychecks), and builders pay to train new people and bring in workers from other states.

Sheet metal workers — worth training up: YES, tight. The data centers need about 182 sheet metal workers at the busiest point — close to all of the ~220 sheet metal workers Louisiana has free for this kind of work. Expect overtime, steady work, and builders willing to train.

Electricians — worth training up: YES, tight. The data centers need about 1,639 electricians at the busiest point — close to all of the ~2,702 electricians Louisiana has free for this kind of work. Expect overtime, steady work, and builders willing to train.

Network/low-voltage technicians — could go either way. The data centers need about 364 network/low-voltage technicians, and Louisiana has about 745 free for this kind of work. Enough to mostly cover it, but it will be busy, with some overtime.

Carpenters — could go either way. The data centers need about 1,002 carpenters, and Louisiana has about 2,205 free for this kind of work. Enough to mostly cover it, but it will be busy, with some overtime.

HVAC/R technicians — probably not, just for this. The data centers need about 364 hvac/r technicians, and Louisiana already has about 1,260 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

Pipefitters — probably not, just for this. The data centers need about 637 pipefitters, and Louisiana already has about 2,260 free for this kind of work. Plenty. Still steady work, but no special data-center shortage.

Data center technicians — worth training up: YES. Once these data centers open they will need about 446 data center technicians to run them, day and night. These are permanent jobs, and there are not enough local data center technicians to fill them — so they hire and train. Steady, long-term work.

These are some of the best-paying jobs you can get without a four-year degree. When a trade is short, builders run overtime and pay to train, and experienced workers can clear $100,000 a year, with health care and a pension through the union.

The building jobs run for a few years; the jobs that run the data centers last longer. Either way, a shortage is good news if you are in that trade. To start in Louisiana, look at the apprenticeship programs for the trade you want. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Every trade

Every trade, by the numbers

Is there a shortage of each trade for the data centers in Louisiana?
Trade Needed at peak Free to take it on Short or extra New data-center jobs Train up?
Electricians 1,639 2,702 1,063 spare 115 YES
Carpenters 1,002 2,205 1,203 spare CLOSE
Ironworkers 819 390 short 429 YES
Pipefitters 637 2,260 1,623 spare NO
Welders 455 3,090 2,635 spare NO
HVAC/R technicians 364 1,260 896 spare 51 NO
Network/low-voltage technicians 364 745 381 spare 25 CLOSE
Plumbers 273 2,260 1,987 spare NO
Data center technicians 258 short 188 446 YES
Sheet metal workers 182 220 38 spare YES
Elevator mechanics 91

"Needed at peak" is the most of that trade working across all the building at the busiest time. "Free to take it on" is how many local workers could move to data-center jobs — about 1 in 4 of the trade; the rest keep their regular jobs. "Short or extra" is the gap. "New data-center jobs" are permanent jobs that stay once a data center opens. "Train up?" is YES when the work needs more than the area can spare (so they pay well and pay to train), NO when there are plenty already. Elevator mechanics are left out of the verdict because their work depends on the building's design.

Get the Louisiana data-center jobs report

We will email you new Louisiana sites, tips on getting hired, and pay updates. Free.

NO SPAM|UNSUBSCRIBE ANYTIME|FREE FOREVER