P Prentice
WhiteFiber · NC

WhiteFiber NC-1 AI Data Center Campus

Being built now · 40 MW in Madison, NC. See which trades build a data center this size.

WhiteFiber |Opens around 2026
Size
40 MW
Status
Being built now
Total workers on site at peak
77
Built by
WhiteFiber
This data center: built vs. still to build
Running now: 0 MW Still to build: 40 MW Total: 40 MW
Who builds it

Workers on site at peak at WhiteFiber NC-1 AI Data Center Campus

Electricians22Carpenters13Ironworkers11Pipefitters8Welders6HVAC/R technicians5Network/low-voltage technicians5Plumbers4Sheet metal workers2Elevator mechanics1

How many of each trade will be working on this site at the busiest point.

The short version

What this data center means for the trades

WhiteFiber NC-1 AI Data Center Campus is WhiteFiber's data center in Madison, NC. It is being built right now, and it will be about 40 MW when it is done. It is set to open around 2026.

A data center this size takes a small army to build. At the busiest point, about 77 workers will be on site at once. Electricians are needed the most — about 22 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.

Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.

Madison is part of a bigger building boom in North Carolina, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a North Carolina apprenticeship. The trade pages for North Carolina show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.

Track WhiteFiber & North Carolina data-center hiring

We will email you new sites, tips on getting hired, and pay updates. Free.

NO SPAM|UNSUBSCRIBE ANYTIME|FREE FOREVER