Meta Bowling Green Campus
Being built now · 350 MW in Bowling Green, OH. See which trades build a data center this size.
Workers on site at peak at Meta Bowling Green Campus
How many of each trade will be working on this site at the busiest point.
What this data center means for the trades
Meta Bowling Green Campus is Meta's data center in Bowling Green, OH. It is being built right now, and it will be about 350 MW when it is done. It is set to open around 2027.
A data center this size takes a small army to build. At the busiest point, about 672 workers will be on site at once. Electricians are needed the most — about 189 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.
Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.
Bowling Green is part of a bigger building boom in Ohio, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.
Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a Ohio apprenticeship. The trade pages for Ohio show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.
Track Meta & Ohio data-center hiring
We will email you new sites, tips on getting hired, and pay updates. Free.