Blueprint Data Centers · TX

Blueprint Data Centers - Taylor Campus

Being built now · 60 MW in Taylor, TX. See which trades build a data center this size.

Blueprint Data Centers |Opens around 2027
Size
60 MW
Status
Being built now
Total workers on site at peak
115
Built by
Blueprint Data Centers
This data center: built vs. still to build
Running now: 0 MW Still to build: 60 MW Total: 60 MW
Who builds it

Workers on site at peak at Blueprint Data Centers - Taylor Campus

Electricians32Carpenters20Ironworkers16Pipefitters13Welders9HVAC/R technicians7Network/low-voltage technicians7Plumbers5Sheet metal workers4Elevator mechanics2

How many of each trade will be working on this site at the busiest point.

The short version

What this data center means for the trades

Blueprint Data Centers - Taylor Campus is Blueprint Data Centers's data center in Taylor, TX. It is being built right now, and it will be about 60 MW when it is done. It is set to open around 2027.

A data center this size takes a small army to build. At the busiest point, about 115 workers will be on site at once. Electricians are needed the most — about 32 of them at peak — to run the power. Pipefitters and HVAC crews handle the cooling, ironworkers and welders put up the steel, and cable techs wire the computers together.

Skilled-trade jobs on data centers are some of the best-paying work you can get without a four-year degree. With overtime, experienced electricians and pipefitters often make over $100,000 a year, and the work comes with health care and a pension through the union.

Taylor is part of a bigger building boom in Texas, and workers drive in from all over the area. It is the same across the country: builders cannot find enough skilled workers. The U.S. needs about 140,000 more trade workers by 2030 to build all the data centers, and most builders say hiring is their hardest problem. Microsoft's president has called the shortage of electricians the biggest thing slowing data centers down.

Jobs like this one are why the local trade halls are busy. The work goes through local unions and contractors, and you start through a Texas apprenticeship. The trade pages for Texas show you how. Sources: a national survey of data-center building plans, plus U.S. jobs and pay data.